Now booking Summer 2026 projects — Lock in current pricing! Get Free Quote →

ADU construction Orange County

ADU Construction · Orange County

ADU Contractor Orange County

We build detached ADUs, garage conversions, JADUs, and SB9 units across Orange County. Permits handled. Design coordinated. Keys delivered. CA Lic. #1127416.

Permits Included Fixed-Price Proposals CA Licensed & Insured

Why Build an ADU

The Highest-ROI Move You Can Make on Your Orange County Property

Orange County homeowners are sitting on some of the most valuable land in California. An ADU lets you put that land to work — generating rental income, housing family members, or adding significant equity without buying a new property.

The average detached ADU in Orange County adds $180,000–$300,000 in property value and generates $1,800–$2,800/month in rental income. That is a mortgage offset most homeowners did not know was sitting in their backyard.

But only if it is built right, permitted clean, and delivered on time. We have handled the full ADU process — design coordination, permit submittal, construction, and Certificate of Occupancy — so you can focus on what to do with the income, not the headache.

Detached ADU Orange County
ADU garage conversion Orange County
ADU completed Orange County

What We Build

Every Type of ADU in Orange County — Done Right

Every property is different. We assess your lot, your goals, and your budget to recommend the right ADU type before we quote a single dollar.

Most Popular

Detached ADU

A fully independent structure in your backyard, separate from your main home. Maximum privacy for tenants or family. Typically 400–1,200 sq ft. Best long-term value addition to your property.

Most Cost-Effective

Garage Conversion

Turn an unused garage into a permitted, rentable unit. Most cost-effective ADU option — the structure already exists. Works as a JADU (up to 500 sq ft) or full ADU depending on garage size.

Best for Families

Attached ADU

Built as an addition to your existing home, sharing one or more walls. More affordable than detached and gives you added square footage with a fully independent unit. Common for multigenerational living.

Easiest to Permit

JADU (Junior ADU)

Converted from existing space inside or attached to your home, up to 500 sq ft. Lowest permitting hurdles under California law. Great starting option for homeowners exploring rental income for the first time.

Our Process

From Site Visit to Certificate of Occupancy — We Handle Everything

01

Free Site Assessment

We visit your property, review zoning and setback requirements, and assess what ADU options make sense for your lot and goals. No charge, no obligation.

02

Design & Engineering

We coordinate architectural drawings and structural engineering. For standard packages, this is managed in-house. For custom builds, we work with your architect or refer one.

03

Permit Submittal

We prepare and submit all permit documents to your city, respond to plan check corrections, and track status. Most cities take 3–6 months. We keep you updated throughout.

04

Construction & CO

Once permits are issued, active construction takes 4–6 months. We schedule all city inspections and deliver a Certificate of Occupancy — ready to rent from day one.

Why FCD

What Makes Us Different From Every Other ADU Contractor in Orange County

We do not disappear after the permit

Some contractors help you design and permit but hand off construction to subs you have never met. We build it ourselves, start to finish, with the same team.

Fixed-price proposals — no surprises

We lock in price before we break ground. Change orders only happen if you change the scope, not because we estimated incorrectly.

We know every OC city's permit process

Garden Grove, Irvine, Anaheim, Huntington Beach — each city has different timelines, fees, and requirements. We have been through all of them.

Daily updates. Always reachable.

You get photo logs every day your project is active and direct access to your Project Manager — not a call center, not a shared inbox.

By the Numbers

$150K–$350K

Typical ADU Range

8–14 mo

Site Visit to Keys

3–6 mo

Typical Permit Window

$1,800+

Est. Monthly Rental Income

Ready to find out what is possible on your property? We will assess your lot, run the numbers, and give you an honest picture — no pressure, no sales pitch.

Get Free ADU Assessment →

Service Area

ADU Contractor Serving All of Orange County

Garden Grove, CAAnaheim, CASanta Ana, CAHuntington Beach, CAIrvine, CAFullerton, CAOrange, CAWestminster, CAFountain Valley, CACosta Mesa, CATustin, CABuena Park, CA

FAQ

ADU Questions — Answered Honestly

Ready to Start?

Let's Talk About Your ADU Project

A 20-minute call is enough to tell you what is possible on your property, what it will cost, and how long it will take. No pressure. Just honest answers.

CA Lic. #1127416 · Fully Licensed, Bonded & Insured · Serving Orange County, CA